Nine design cores of precision metal stamping molds
Time : 2023-05-26 Click count : 1774

1、 Obtain necessary information

Based on relevant data, analyze the stamping processability and conduct process and standardization audits on the workpiece.

1) Obtain product part drawings that indicate specific technical requirements. Understand the shape, size, and precision requirements of the workpiece. The dimensions (size and position) of key holes, key surfaces, and the analysis and determination of the reference plane of the workpiece.

In fact, the process requirements for stamping parts are not absolute. Especially in the current situation of rapid development of stamping technology, it is necessary to comprehensively apply various stamping technologies according to the actual needs and possibilities of production, reasonably select stamping methods, correctly formulate stamping processes, and select mold structures, which can meet both the technical requirements of the product and the stamping process conditions.

2) Collect process cards for workpiece processing. Therefore, we can study the relationship between the previous and subsequent processes, as well as the processing requirements and assembly relationships that must be mutually guaranteed between processes.

3) Understand the production batch of the workpiece. The production of parts plays a decisive role in the economy of stamping processing. Therefore, based on the production batch of parts and the quality requirements of parts, it is necessary to determine the mold type, structure, materials, and other related matters. This analyzes the economy of mold processing technology and the rationality of public building production, and outlines the stamping steps.

4) Determine the specifications of the workpiece and raw materials (such as plates, strips, coils, waste, etc.), understand the properties and thickness of the materials, determine whether to sample with minimal waste based on the manufacturability of the parts, and preliminarily determine the specifications and accuracy level of the materials.

On the premise of meeting the requirements of usability and stamping performance, try to use inexpensive materials as much as possible.

5) Analyze the requirements for material fiber direction and burr direction in design and process.

6) The technical capability and equipment conditions for manufacturing molds in the analysis tool (mold) workshop, as well as the availability of standard mold parts.

7) Familiar with the equipment information or situation in the stamping workshop.

8) Study and digest the above data, and preliminarily conceive the mold structure scheme. When necessary, it is necessary to propose modification suggestions for the established product design and process flow, so as to better integrate the process flow of product design and mold design and manufacturing, and achieve a more complete effect.


2、 Determine the process plan and mold structure type

The determination of the process plan is an important step that should be carried out after the process analysis of stamping parts. It includes:

1) Based on the requirements of shape characteristics, dimensional accuracy, and workpiece surface quality, conduct process analysis to determine its main attributes and determine the nature of the basic processes, including cutting, punching, bending, drawing, flanging, and bulging. List all the processes required for stamping, which can generally be directly determined from the drawing requirements of the product parts.

2) Determine the number of processes based on process calculations. For drawing parts, the number of drawing times should also be calculated. Bending and punching parts should be processed one or more times according to their shape, size, and precision requirements.

3) Determine the process layout sequence based on deformation characteristics, dimensional accuracy requirements, and ease of operation. Such as rushing first and then bending, or bending first and then rushing, etc.

4) Based on factors such as production batch, size, precision requirements, mold manufacturing level, equipment capability, etc., combine the preliminarily sorted single processes with possible processes. Such as composite stamping process and continuous stamping process. Generally, thick materials, low precision, small batches, and large-sized stamped parts need to be produced at once, and simple molds should be selected. Progressive molds should be used for continuous production of thin materials, small-sized, and large-scale stamped parts; For stamping parts with high shape and position accuracy, composite molds should be used for stamping.

After determining the nature, sequence, and process combination of the process, the stamping process plan was determined. That is to say, the structural type of the mold in each process has been determined.


3、 Used for necessary process calculations

1) Design material layout and calculate blank dimensions.

2) Calculate the punching force (including punching force, bending force, deep drawing force, flanging force, bulging force, unloading force, pushing force, edge pressing force, etc.), and if necessary, calculate the punching work and power.

3) Calculate the pressure center of the mold.

4) Calculate or estimate the thickness of the main parts of the mold. Such as the thickness of the concave mold, convex mold fixing plate, cushion plate, and the free height of the unloading rubber or spring.

5) Determine the gap between the convex and concave molds, and calculate the dimensions of the working parts of the convex and concave molds.

6) For the deep drawing process, it is necessary to determine the deep drawing method (with or without edge rings), calculate the number of deep drawing cycles, and determine the semi-finished product size in the intermediate process.

For certain processes, such as continuous deep drawing of strip, special process calculations are required.


4、 Overall design of the mold

Based on the above analysis and calculation, the overall design of the mold structure is carried out (usually only a sketch is needed at this time), and the closing height of the mold is preliminarily calculated to roughly determine the external dimensions of the mold.


5、 Structural design of the main components of the mold

1) A part of the workpiece. The design and selection of fixed forms for structural types such as convex molds, concave molds, and convex concave molds.

2) Locate the component. There are many types of positioning devices commonly used in molds. The selection and design of adjustable positioning plates, fixed blocking pins, movable blocking pins, and fixed distance side edges should be based on specific circumstances.

In the continuous mold, it is also necessary to consider whether to use the initial stopper pin.

3) Unloading and propulsion device. Such as the selection and calculation of rigidity or elasticity, springs and rubber, etc.

4) Guiding components. For example, guide columns, guide sleeve guides or guide plate guides, middle guide columns, side rear guide columns or diagonal guide columns, sliding guide sleeves or ball guides with steel balls, etc.

5) Support and clamp parts, fasten parts. For example, the selection of mold handles, upper and lower mold seat structure types, etc.


6、 Selected stamping equipment

The selection of stamping equipment is an important component of process design and mold design. The reasonable selection of equipment has a great impact on ensuring the quality of workpieces, improving productivity, and ensuring operational safety, and also brings convenience to mold design.

The choice of stamping type mainly depends on the process requirements and production batch.

The determination of stamping equipment specifications mainly depends on process parameters and mold structure dimensions. For crank presses, the following requirements must be met:

1) The nominal pressure of the press must be greater than the stamping process force.

More precisely, the load curve of the stamping process must be lower than the allowable load curve of the press.

For deep drawn parts, it is necessary to calculate the drawing work.

2) The installation height of the press must meet the requirements of the clamping height.

3) The stroke of the press should meet the requirements of workpiece forming. For the press used in the deep drawing process, its stroke must be 2-2.5 times higher than the height of the workpiece during this process in order to insert the blank and remove the workpiece.

4) The size of the press table must be larger than the overall size of the mold base, and leave a position for fixing the mold. Generally, if each side is larger than 50-70 mm, the size of the leakage hole on the press table must be larger than the size of the workpiece (or waste).


7、 Draw a general drawing of the mold

The drawing of the overall mold drawing (including part and workpiece drawings) strictly follows the drawing standards (GB/T4457~GB/T4460 and GB/T131-1993). At the same time, in actual production, the layout of its drawings has formed certain habits based on the working characteristics of the mold and the needs of installation and adjustment.

The overall drawing of the mold includes:

1) Main view. Draw the outline of the mold at the work position. Usually, half of the blank positions are drawn before drawing the stamping (when the punch slider is at the top dead center position); The other half is drawn at the bottom dead center position after stamping, indicating that the workpiece has already been formed (or separated).

2) Top view. Usually, the top view of the half and the top view of the upper half are drawn by the other half. As needed, the top view of the lower part is sometimes fully drawn.

3) Side view, bottom view, and partial sectional view, etc. If necessary, draw a side view of the working position of the mold. Sometimes, the bottom view and partial sectional view of the upper part of the mold are also drawn in the upper right corner of the drawing.

4) Workpiece diagram. The general workpiece drawing is located in the upper right corner. For the work done on several sets of molds, in addition to drawing the workpiece diagram for this process, it is also necessary to draw the workpiece diagram for the previous process.

5) Layout diagram. For progressive dies, it is necessary to draw the layout, process arrangement sequence, and stamping content completed in each process step; The spacing between work steps, overlap value, and strip size should be marked. In the layout diagram of the punching die, the layout method, the size of the strip material, and the size of the overlap value should be marked.

6) List the parts list, specifying the materials and quantities. All standard parts should be selected according to specifications.

7) Technical requirements and instructions. Technical requirements include the press machine, equipment model, overall tolerance of the mold, assembly, installation and debugging, mold closure height, mold clearance, and other requirements.


8、 Draw part drawings for each non-standard component

All dimensions, tolerances, matching, shape and position tolerances, surface roughness, materials, heat treatment requirements, and other technical requirements should be indicated on the part drawing.


9、 Fill in the mold record card and prepare the stamping process document

For small-scale production, a process route list should be filled out; During large-scale production, it is necessary to create process cards and process cards for each component.

News Related news
精品亚洲国产成人AV在线小说| 国产精品国产三级国产AV麻豆| 亚洲AV无码成人精品区一本二本| 欧美亚洲国产SUV| 久久久久亚洲AV成人网人人网站 | 国内少妇BBWBBW黑森林| 夫妇当面交换作爱2| 999ZYZ玖玖资源站永久| 伊人久久大香线蕉无码| 亚洲欧洲日产国码中文字幕 | 中文无码AV一区二区三区| 亚洲国产精品久久久久爰| 小宝贝荡货啊用力水湿AⅤ视频 | 韩国免费A级毛片| 国产精品女人呻吟在线观看| 豆国产96在线 | 亚洲| xxxxxx日本黄色| 91精品人妻一区二区三区蜜桃 | 又白又大的两座峰| 亚洲欧美中文日韩在线V日本| 亚洲Av无码一区二区三区大黄瓜| 午夜丰满少妇性开放视频 | 1区1区3区4区产品乱码芒果| 亚洲一级性爱视频| 亚洲日本VA午夜在线影院| 亚洲AV永久无码精品一区| 亚洲AV无码成人精品区在线h| 性猛69式交富婆Ⅹ×××乱大交| 婷深夜综合成人AⅤ网站| 少妇高潮一区二区三区99| 日韩AV无卡无码午夜观看| 日本按摩高潮S级中文片| 人人妻人人澡人人爽秒播| 人妻AV一区二区三区AV免费| 人妻丰满熟妇AV无码片| 日本熟妇大屁股人妻| 日韩欧美操逼视频| 少妇一晚三次一区二区三区| 四虎影视新紧急入口| 挺进邻居人妻雪白的身体韩国电影| 天码AV无码一区二区三区四区| 铜铜铜铜铜铜铜铜好大好硬 | 日韩内射美女片在线观看网站| 日韩精品免费无码专区| 舌尖伸入湿嫩蜜汁呻吟| 无码高潮少妇毛多水多水免费 | 中文字幕日韩精品无码内射| 最新中文AV岛国无码免费播放| 99国产精品永久免费视频| 99精产国电影品一二三产区区别| Xx性欧美肥妇精品久久久久久久久| А√天堂中文在线资源BT在线| 成人免费视频一区二区| 国产AV午夜精品一区二区入口| 国产精品成人一区二区不卡| 国产亚洲AV综合人人澡精品| 精品不卡一区二区| 六十路七十路熟女乱码| 欧美另类精品黑人巨大| 日韩欧美视频一区二区| 我半夜摸妺妺的奶C了她动漫| 性色av无码人妻少妇肥臀| 亚洲日韩乱码中文无码蜜桃臀网站| 又硬又粗又长又爽免费看| MD豆传媒APP网址入口免费| 成人免费无码不卡毛片| 国产激情一区二区三区视频免樱桃 | 男女啪啪无遮挡免费网站| 热久久99这里有精品综合久久 | 欧美黑人巨大最猛性XXXXX| 欧亚精品卡一卡二卡三7174 | 宝宝锕~进去就不痛了在线观看| 顶级大但人文艺术中的绘画作品| 国产精品自在拍首页视频| 狠狠爱ADY亚洲色| 妺妺跟我一起洗澡没忍住| 日韩AV无码免费播放| 无线乱码不卡一二三四破解版| 亚洲日韩一区二区三区黑人| 17岁俄罗斯CSGO| 肥胖孕妇BBWBBWBBW| 含羞草传媒入口免费网站腾讯网| 老头扒开粉嫩的小缝亲吻网站| 人人妻人人澡人人爽欧美精品| 午夜射精日本三级| 伊人久久综合无码成人网| 波多野结衣的电影| 国产亚洲AV人片在线观看| 久久夜色精品国产噜噜| 日本熟妇人妻XXXXX| 亚洲AV一本岛在线播放| 69国产成人精品午夜福中文| 国产AV无码专区亚洲AV桃花庵| 精品无人区一区二区三区在线 | 爸爸入狱以后妈妈双人桥小权| 国产精品亚洲专区无码唯爱网| 久久人人爽人人爽人人AV| 日本特黄特色AAA大片免费| 亚洲AV无码国产蜜桃麻豆| 69成人免费视频无码专区| 国产精品无码久久久久久久久久| 久久夜色噜噜噜亚洲AV| 日韩精品无码一区二区 | 医院人妻闷声隔着帘子被中出| 饱满的乳被揉捏玩弄| 黑人巨大精品欧美黑寡妇| 欧美男女一进一出| 亚洲AV无码成人精品区毛片 | 香港三日本三级少妇三级2021 | 51爆料网每日爆料黑料| 国产成人亚洲综合无码99| 狂野欧美激情性XXXX在线观看| 视频二区精品中文字幕| 一区三区四区产品乱码| 国产 字幕 制服 中文 在线| 久久久久亚洲AV成人网人人| 四虎成人精品国产永久免费无码| 一本久久综合亚洲鲁鲁五月天| 囯产精品一区二区三区线| 老湿机69福利区无码| 无码AV免费精品一区二区三区| 中国熟妇老熟女妓女9| 国产精品国产精品偷麻豆| 男生裸睡勃起流出液体| 小雪被老汉玩遍各种方式电影| CAOPOREN超碰| 精品少妇人妻av免费久久洗澡 | 欧洲VODAFONEWIFI喷| 亚洲娇小与黑人巨大交| 丁丁一进一出动态图| 巨胸美乳无码人妻在线| 小鲜肉洗澡时自慰网站XNXX | 国产成人亚洲精品无码高潮| 门徒电影高清完整版在线观看| 亚洲AⅤ精品无码一区二区嫖妓| 爸的比老公大两倍儿媳妇怎么称呼| 精品欧美一区二区三区久久久| 少妇人妻14页_麻花色| 18大禁漫画吃奶羞羞漫画| 姬小满乳液狂飙奖励自己| 丝袜中文人妻无码有码久热| 91人妻丰满熟妇Aⅴ无码| 精品人妻一区二区三区| 婷婷人人爽人人爽人人片| IPHONE14欧美日韩版本| 久久人人爽人人爽人人AV| 亚洲AV无码成人精品区天堂| 丁香花在线视频观看免费| 欧美交换配乱吟粗大| 一本色道久久综合狠狠躁| 国产亚洲AV无码AV男人的天堂| 日韩综合无码一区二区| AⅤ中文字幕不卡在线无码| 久久久久久毛片精品免费不卡| 性高朝久久久久久久久久| 俄罗斯人和欧洲人长相区别| 欧美日产国产精品| 征服丝袜旗袍人妻| 久艾草久久综合精品无码| 无码中文字幕加勒比一本二本| 成人乱子视频在线播放| 欧美日韩精品成人网站二区A∨有| 伊人久久大香线蕉精品| 精品人妻一区二区三区视频| 性高朝久久久久久久| 国产VA免费精品高清在线观看| 日本不卡在线视频二区三区| 999国内精品永久免费视频| 看全色黄大色黄大片 视频| 亚洲人成人一区二区在线观看| 国产综合18久久久久久| 无码人妻一区二区三区免费| 妇女被深耕过后的变化| 日本三级在线播放线观看视频| A级毛片毛片免费观看久潮喷| 蜜臀亚洲AV无码精品国产午夜.| 亚洲已满18点击进入在线看片 | 婷婷蜜桃国产精品| 对白脏话肉麻粗话AV| 日本免费一区二区三区| H漫全彩纯肉无码网站| 欧美富婆性猛交XXXX| 2021无码专区人妻系列日韩| 久久中文骚妇内射| 一本久久A久久精品亚洲| 久久久久久久无码高潮| 亚洲熟妇久久国内精品| 久久成人伊人欧洲精品| 亚洲一区二区三区国产精华液| 精品人妻AV区乱码| 亚洲欧美综合一区二区三区| 精品国产18久久久久久| 亚洲国产精品无码久久一线 | 全部免费毛片在线播放| A级精品国产片在线观看| 欧美18ⅩXOO极品| YELLOW免费观看高清在线| 欧美性爱XXXX黑人| 八戒八戒神马影院在线观看 | 乌克兰13一14处A交|